Southern Water: Final Effluent Inspection Chamber Lining

Morrison Utility Services commissioned us to work on a number of Southern Water’s waste water treatment sites and instructed us to line a number of final effluent inspection chambers in Kent, Sussex, Surrey and Hampshire. The chambers were used for checking and monitoring the quality of water leaving the waste water treatment sites.

The Client

The individual sites required a lining that would be durable, environmentally safe, white for ease of inspection and provide a smooth surface for ease of cleaning. The lining system currently specified for lining the chambers required the surface of the concrete and brick to be completely dry prior to application.

The work would be carried out during the winter months, it was not practical for us to use that system on existing old concrete or brick chambers, as the surface would certainly be either damp or wet. We, therefore, agreed to provide a lining system that could be applied to either damp or wet concrete or brick surfaces.


Challenges

  • The chambers were constructed from either concrete or brick.
  • Although some of the chambers were new concrete structures, many were old, uneven and in poor condition
  • All of the concrete chambers had holes in the surface of the concrete left over from the construction process.
  • The conditions within the chambers would for the most part be damp or at least contain high levels of humidity.
  • The work would predominantly be carried out in low temperatures conditions.
  • Many of the chambers would be classified as being confined spaces.
  • Resin materials were required to be tolerant to damp or wet conditions during application and suitable for fresh “green” concrete.
  • The risk of possible ingress of water during the works was apparent.
  • The surface of the materials used needed to provide a glossy surface, which would ease cleaning and inhibit algae growth.
  • The coating system had to be environmentally safe and non-toxic.
  • The coating system needed to be durable, as the constant flow of water would have an erosion effect on any material used.
  • It also had to be flexible because the chambers are subject to temperature variations.
Damp Concrete Final Effluent Chamber - Before treatment
Concrete Final Effluent Chamber - Before treatment
Concrete Final Effluent Chamber - Before treatment
Concrete Final Effluent Chamber - During treatment
Concrete Final Effluent Chamber - During treatment
Concrete Final Effluent Chamber - During treatment
Concrete Final Effluent Chamber - Final treatment
Concrete Final Effluent Chamber - Final treatment
Concrete Final Effluent Chamber - Final treatment

Solution

A site team from Morrison Utilities Services prepared the chambers for us by erecting a tent over the site, carrying out basic cleaning of the chamber and inserting inflatable bladder bungs into the inlet pipework. They were also responsible for correcting the falls, installing benching in the corners of the chambers and new weir plates as required.

Morrison Utilities Services redirected the final effluent water to a temporary tank system whilst our works were being carried out. Because the chambers were all unique in their construction, size and dimensions, we devised a resin-based lining system that could be applied to damp and wet conditions and would be generic in its capacity to provide a hygienic durable surface that was environmentally friendly and could be jet washed when necessary to meet with the high standards that a modern water treatment facility requires.

We abraded the concrete and brick surfaces, and after cleaning we applied a green concrete damp surface epoxy-based primer to the walls and floor of the chambers. The following day, we trowelled onto the walls of the chamber a screed of damp surface tolerant epoxy resin-based paste filler to fill the holes and smooth out the uneven surfaces. If the surface of the floor of the chamber was in particularly poor condition, we applied a thick resin mortar slurry to improve its strength. During the following two days, we applied four coats of moisture tolerant solvent-free epoxy resin to the walls and floor of each inspection chamber. Each coat process was applied in different colours to ensure complete coverage each time.

Damp Brick chamber lining - before treatment
Damp Brick chamber lining - during treatment
Damp Brick chamber lining - after treatment

The Results

The team were on each site three to four consecutive days for us to complete each chamber and we followed the same process for each treated site. The final surface coating was smooth, glossy and finished in white, which will aid inspection, be easy to clean and deter the growth of algae etc.

The chambers were left with the inclement weather protection tent in place, which the Morrison Utilities Services site team dismantled when they returned to the site.

Appledore, Damp Concrete Outlet chamber wall before jet washing
Appledore, Damp Concrete Outlet chamber wall before jet washing
Appledore, Finished chamber

Wherever you are in the world, whatever the problem,
we have the expertise to help.

Speak to an advisor today!

error: Content is protected !!